KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  6-7-2017
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Baffle 24 Snorkle

I finished the gate install and moved to finishing the cable install for this gate. I had to locate and drill a hole thru the firewall. I chose the location on the pilot side right in line with the gate.

I added a firewall passthru. I had this one left over in inventory. It is a bit complicated but worked well.

I added a couple of adel clamps per plans.

I cut the cable to length and twisted the end around the part of the gate that opens, all per the drawings.
' style=

Firewall PassThru Gate Cable

Firewall PassThru Gate Cable

' style=

Gate Cable Routing

Gate Cable Routing

' style=

Cable termination at Gate

Cable termination at Gate

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.