KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  8-27-2009
Number of Hours:  0.30
Manual Reference:  
Brief Description:  Fwd Fuselage - Dissmble & Prep 21 Mid Fuselage

Mid fuselage requires several preparations. First I had to retrim the aft ends of the cargo rib flange for the 5/8 bushing. Somehow I had trimmed the wrong side previously. I used the little nibbers followed by sand drum and they are now smooth.

Then I dimpled the aft two row of holes that connect to the aft fuselage.
' style=

Trim flange

Trim flange

' style=

Dimple aft holes

Dimple aft holes

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.