KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  8-24-2009
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Fwd Fuselage - Dissmble & Prep 18 Side Skin

I roughed up the inside surface, cleaned and primed.

Then I also thought about these little parts that hold the tank bracket. The skin is dimpled on the thre #40 holes. So I dimpled the thin spacer to receive the skin dimples. And I countersunk the thick spacer to receive the dimples of the thin spacer. I clecoed them all together and they fit flush.
' style=

Scratched and cleand side skin

Scratched and cleand side skin

' style=

Primed inside of side skin

Primed inside of side skin

' style=

Dimpled and countersink #40 holes

Dimpled and countersink #40 holes

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.