KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  8-4-2009
Number of Hours:  0.50
Manual Reference:  
Brief Description:  Fwd Fuselage - Pickups: Lnd Gear Bracket 2

These first five hole on each landing gear bracket get drilled to #12 or 3/16 inches as they say in America. No countersink. Just holes.

I drill with 1/8 first then enlarge to #19 then to #12.
' style=

Bracket bolted for drilling

Bracket bolted for drilling

' style=

First the 5 aft holes

First the 5 aft holes

' style=

#12 on both sides.  No countersink

#12 on both sides. No countersink

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.