KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  8-4-2009
Number of Hours:  0.50
Manual Reference:  
Brief Description:  Fwd Fuselage - Pickups: Lnd Gear Bracket 1

First thing I decided to do was drill the side holes for the landing gear bracket. There are several holes to drill and countersink. But first I decided to drill out this pesky Universal rivet which should have been a flush rivet and will be later.

Then I re-installed the bottom skin and mounted the landing gear brackets.
' style=

Pesky Universal rivet

Pesky Universal rivet

' style=

Gone, That Was Easy

Gone, That Was Easy

' style=

Drill these 5 holes first

Drill these 5 holes first

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.