KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  7-25-2009
Number of Hours:  0.50
Manual Reference:  
Brief Description:  Fwd Fuselage - Rudder & Brake Pedals 1

It is interesting how this hand made airplane goes together in packages of work. I find I have to study up on the next package of work before doing it.

So first thing I do is get the primary drawing on the table and look at it. And collect up all the parts and raw materials.

I only ordered brakes for the pilot, not the co-pilot. I wonder if this is a dumb idea.

First task was to debur. I used the file and scotchbright. I used a little scotchbright wheel for inside the holes.
' style=

Rudder Brake Peddles

Rudder Brake Peddles

' style=

The parts needed the pedals

The parts needed the pedals

' style=

Debur with file and scotchbright

Debur with file and scotchbright

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.