KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  7-20-2009
Number of Hours:  0.50
Manual Reference:  
Brief Description:  Fwd Fuselage - F-902 Fwd Bulkhead 2

To finish the 902 fwd bulkhead I marked and drilled the end tabs to the bottom and main longerons.
' style=

Marked position of tab and drilled

Marked position of tab and drilled

' style=

Drilled

Drilled

' style=

Same on bottom (top)

Same on bottom (top)

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.