KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  7-11-2009
Number of Hours:  0.50
Manual Reference:  
Brief Description:  Fwd Fuselage - Drill Firewall Side Skins

When I came back I again ensure the firewall was 5/8 from the skin fwd edge. I ensured brackets were all clamped. So I drilled the first two holes on bottom skin. Just two per plan. Then I drilled the side skins to firewall. I tried a steel bit but it did not work as well as my regular Avery #40 bit. I started at the longeron and moved down which was really up since it is upside down.
' style=

Drilled first one on top 2 places

Drilled first one on top 2 places

' style=

Drilled from longeron up

Drilled from longeron up

' style=

Edge margins good.

Edge margins good.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.