KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  6-15-2009
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Mid Fuselage - Drill & prep Floors to #19

I'm almost done preparing the mid fuselage for final riveting. But since I've decided to make the floors removable I need to drill and prepare them now.

I removed the blue stuff; clecoed on the floors and drill all the holes to #19 for the #8 screws that will be used. I ordered 75 more black clecos from Avery so I could cleco all the floor panels in place for drilling.

I also rolled the edges down just to put a little pre-load on the edges so they don't curl up.
' style=

Remove blue stuff

Remove blue stuff

' style=

Cleco in place and drill

Cleco in place and drill

' style=

Roll the edges

Roll the edges

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.