KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  5-25-2009
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Mid Fuselage - Cut Off Tops of 4 Seat Ribs 1

Per drawing I measured 2 inches from radius and cut off the top of the seat ribs. I cut perpendicular to the adjacent rib perimeter. I cut with the snippers. I went ahead and finished these. I drilled the #19 hole in the ends; 3/32 in centers; used regular rivets to attach the strengthening bar to the cut out piece and used oops rivets to fasten the platenut.

All four done. I like finishing off what ever little part I can so I don't have to keep track of it.
' style=

Cut off top of seat ribs

Cut off top of seat ribs

' style=

Used snipper

Used snipper

' style=

Finished off these little parts

Finished off these little parts

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.