KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  4-24-2009
Number of Hours:  0.50
Manual Reference:  
Brief Description:  F-712 Builhead - Start Make Tie Down

The F-712 bulkhead is just two plates and a tie down. I cut the tie down to size per drawing. Gotta have a bandsaw. I put threads in it. And drilled the 8 holes. I use that little 1/8 centering bit. It works great because I scribe the lines and the centering bit fits right into the cross hairs of the scribed lines for perfect hole location.
' style=

Make tiedown

Make tiedown

' style=

Tap it

Tap it

' style=

Drill 8 holes

Drill 8 holes

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.