KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  4-21-2009
Number of Hours:  0.50
Manual Reference:  
Brief Description:  F-706 Bulkhead - Cleco Whole Frame & Drill

Next I clecoed the whole thing together. I match drilled all the holes I could like corners and plate. I positioned the top and drilled those holes. Then I pondered the position of the longest angle and discovered its one drilled hole would cleco to the rib as a starting point. So then I drilled the rest of the holes including the 1/4 hole in this angle.
' style=

Clecoed 706 bulkhead

Clecoed 706 bulkhead

' style=

Position Tob Rib

Position Tob Rib

' style=

Drill vertical angle

Drill vertical angle

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.