KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  4-15-2009
Number of Hours:  1.00
Manual Reference:  
Brief Description:  F-705 Bulkhead - Drill Seat Adjustment Parts

To drill all the parts for the seat adjustment, I decided to do them one at a time. I marked a line lengthwise where I wanted the holes to line up. And this line was marked per dimensions on the drawing. I drilled the spacer first by lining up the line thru the holes, clamping and drilling. I removed the spacer and did the same thing for the bent plate.

Then I clecoed on the spacer and bent plate and positioned the angle. Per drawing the angle does not touch or ride down on the bent plate. It is 1/4 inch off the surface of the bulkhead. So I put my ruler under it to hold it up in position, clamped and drilled.
' style=

Drill spacer and plate one at a time

Drill spacer and plate one at a time

' style=

Clamp angle and drill

Clamp angle and drill

' style=

This shows 1/4 clearance on angle

This shows 1/4 clearance on angle

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.