KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  2-24-2009
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Flaps - Squeeze rib and pulled rib/spar rivets

Next I squeezed the -7 length rivets through the inboard rib doublers. And put three pulled rivets on the spar to rib-flange on the outboard rib. I tried squeezing rivets here and then also tried pounding rivets here but I didn't like the result so I just used pulled rivets per drawing. The flaps are almost done.
' style=

Squeezed these -7 length rivets

Squeezed these -7 length rivets

' style=

Pretty good shop heads

Pretty good shop heads

' style=

Pulled rivets in outboard rib

Pulled rivets in outboard rib

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.