KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  2-23-2009
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Flaps - Prime and start riveting

I spent a few hours priming all the flap parts. Yes I'm still using rattle can SEM self etching primer. Then I assembled the frame enough to position the spar, inboard rib and the 706A & 706B doublers. I wanted to make sure the spar doubler was clecoed with all the other parts when I rivet it. I riveted it with the pnuematic squeezer.
' style=

Prime the Flap

Prime the Flap

' style=

Assemble for riveting

Assemble for riveting

' style=

Rivet on the FL-706A doubler to spar

Rivet on the FL-706A doubler to spar

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.