Date:  2-14-2009
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Ailerons - Final Assembly 5

Then I laid the aileron flat, weighed it down to install pulled rivets to hold the counter weight pipe. I put a level on it to see if it was straight and to ensure it stayed straight. Not sure what I would do if it wasn't. I sprayed primer in all the holes and onto my pulled rivets in hopes of isolating the aluminum from the galvanized pipe. I pulled the rivets. Easy as pie.
' style=

Laid flat to install pulled rivets

Laid flat to install pulled rivets

' style=

Primed the rivets and holes

Primed the rivets and holes

' style=

Pulled all the rivets

Pulled all the rivets

' style=