Brief Description: Leading Edge - Riveting Left LE to Spar 2
After attaching the LE ribs to the spar, I attached the tank to the LE and to spar with bolts. Then I finished this job by riveting the row of flush rivets around the LE. Left Leading Edge and Tank are complete