KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  12-13-2008
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Leading Edge - Prep and redo Inbd Rib 2

I removed the blue stuff for dimpling, but did NOT measure it. I also deburred and dimpled the skin holes. The DRDT-2 does a good job at dimpling. I'm using about 3/4 extra turn of preload and I snap the handle down. I hope I don't break it.
' style=

Blue Stuff removed over holes

Blue Stuff removed over holes

' style=

C-frame dimpling

C-frame dimpling

' style=

Re-assembled

Re-assembled

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.