KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  11-25-2008
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Tank Assy - Outboard Lft Rib Installation 2

Then I coated the rib with Proseal, put it in place, clecoed everyhole and started squeezing rivets. I used blue tape to keep Proseal off the very outside edge where it will connect to the leading edge
' style=

Clecoed in place

Clecoed in place

' style=

Fun stuff.  I'm hooked.

Fun stuff. I'm hooked.

' style=

Done

Done

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.