KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  11-13-2008
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Tank Assy - Rivet Ribs Tips 1

It is taking me about 90 minutes per rib. I've done 3 now. I'll include photos of tips I'm learning. I'm riveting with the tank in its stand vertically, not horizontal. I have it fastened to the cradle and workbench so it doesn't move. I put rivet tape on the flush rivet set. I'm using tweezers to pickup and put rivets in the holes because I'm wearing rubber gloves and they are not to nimble.
' style=

Riveiting

Riveiting

' style=

Tape on flush set

Tape on flush set

' style=

Tweezer to pick up rivets

Tweezer to pick up rivets

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.