KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  10-11-2008
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Tank Prep - Drain Flange VA-112

I located and drilled the Fuel Drain Flange. I put a bolt thru the back to hold it centered over the hole. The holes are already countsunk. Easy part to work on so far.
' style=

Locate and clamp the Drain Flange

Locate and clamp the Drain Flange

' style=

Drill Cleco as you go

Drill Cleco as you go

' style=

Ready for final riveting.

Ready for final riveting.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.