KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  8-17-2008
Number of Hours:  0.50
Manual Reference:  
Brief Description:  Spar - Inspected and found dings and scratches

I then inspected the spars per the plan and found lots of little dings, scratches and stuff. I sent photos to Van's their engineering said these are okay, but the offered to replace them, which I denied. Then they offered a $100 credit, which I accepted. So full speed ahead.
' style=

scratch

scratch

' style=

PN typed over

PN typed over

' style=

Ding

Ding

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.