Started the elevator today. First thing I do now is read the whole plan and study the drawings. It helps to get familiar with all the part numbers and part names in advance of doing anything. I will build both elevators at the same time, so I've laid out both drawings on my bench. First step, cut the stiffners; clecoed them to skin and match drilled all the holes.