KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  11-3-2015
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Elevator Painting

After priming I taped off the end of the elevator where the blue and grey paint will be and I sprayed the rest white.

Then I changed the tape around and painted the grey.

Then I changed the tape again and painted the blue.

You can begin to see the design pattern.

But this process was way to labor intensive and pron to error on taping. And I ended up with high lips between colors. I sanded and polished down the lips.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.