KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  9-22-2019
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Wheel Pants & Fairings 6

Gear and leg fairings are fully installed.

Speed looks to have increased by 15 to 20 kts. At 24x24 I'm seeing 150 kts indicated airspeed. Seems like it was 130kts before. This is at sea level.
' style=

Gear & leg fairings

Gear & leg fairings

' style=




' style=

150 kts 24x24 IAS

150 kts 24x24 IAS

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.