KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  9-7-2019
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Phase 1 Complete 3

Part of finishing phase 1 testing was a long cross country to WAAAM at Hood River. This also tested the camping capabilities of the RV. Everything worked fine, except the start up the next day was rough. The fuel injected engine still kicks my butt on start both cold and hot. But so far no failures. Just worries.

I don't have a photo but I did run jumper wires from the battery into the cockpit during last oil change. This is so I can jump it from the cockpit if needed.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.