KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  8-29-2018
Number of Hours:  0.50
Manual Reference:  
Brief Description:  Flaps getting put back on 3

I put paint on all the bolts and bearings and push rods. Note I screwed the hinge pins into place.

I did a lot of testing, running the electric flaps up and down and up and down to make sure they came all the way up. I cleaned out the holes a bit more. I adjuste the push rod lengths a bit more. This all took several hours. It was not quick to just put on the flaps. But now everything fits just right.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.