Date:  4-21-2018
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Floors Final Installation 2

Well with electrical finished and tested I can start final assembly. First thing is the floors. Putting in the floors will strengthen the fuselage so stepping in will be less stressful. Plus the floors need to be in for the flap mechanism to go in.

So I put in the cargo floor and the first part of the seats floor. The seat front floor will have to wait until after the wings are on. I need access to install bolts, and wiring from the wing.

I also examined all my electrical runs and added tie downs where needed.

I also checked the seat belt bolts. They are all torqued.

I added the flap mechanism arm. I'll hold off on the rest of the flaps until after I do the fuel pump in the front. Because I will need leg room to do that pump.

PS the seat floor goes on top of the cargo floor where they overlap.
' style=

Cargo Floor screwed on

Cargo Floor screwed on

' style=

Seat floors screwed on

Seat floors screwed on

' style=

Flap arm is in

Flap arm is in