KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  2-3-2018
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Control Sticks Wiring

Time to start doing the wire bundles that plug into the Advance System Module.

I did the control sticks because all the wires are ready.

1) Cut all the wires to the right length. I bit scary because you don't want to make it too short.
2) Put on sleeving and shrink wrap tubing now before you remove insulation.
3) Push he sleeve and shink wrap up out of the way
4) Remove insulation
5) Crimp on d-sub pins
6) Carefully follow the pin map and plug the pins into the numbered holes. Don't screw this up.
7) Test anything you can, which isn't much
8) Cover it up and add the connector.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.