KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
< Previous Log Entry          Next Log Entry >
' style=
Date:  10-11-2017
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Baffle Material 1

Time to add the rubber baffle material at the top of the baffles.
I cut 3 inch strips and rivetted on per plans and drawings.
' style=





' style=




' style=




' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.