KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  6-8-2017
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Fuselage Painting 11 Baffles and Prop Parts

It has been about a year. The engine is installed. The cowls have been trimmed and finished. The prop has been installed and all the metal parts fitted. The baffles have all been installed and trimmed. The paint booth is still available so before it gets rented I deced to paint all these parts.

After this paint session the only part left to paint is the single skin that covers the front top fuselage over the top of the avionics. That will be done last and painted in place, outside.

I followed the same process:

Clean, degrease, etch prime, sealer prime, top coat.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.