KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  4-17-2017
Number of Hours:  0.50
Manual Reference:  
Brief Description:  Baffles 4

I finished riveting on all the doublers. Then drilled the hols for the spark plug wires. Best way to do this is to drill two 3/4 holes 0.660 inches apart. I looked up the part dimensions on-line. Drawing says these holes are 0.61" apart, but that wasn't enought. Do a little deburring and the spark plug wire holder fits great.
' style=

Rivet on doublers

Rivet on doublers

' style=

Drill holes for spark plug holder

Drill holes for spark plug holder

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.