KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  9-14-2016
Number of Hours:  0.50
Manual Reference:  
Brief Description:  Cables 2 - Panel Placement

The cables are going to have to be completed early, way before the panel, because they get hooked up with the engine. So I decided to finish off the panel plate the holds the cables.

After some research I decided to use the primer color with semi-gloss clear spray on top.

I mounted all 5 cables on the subpanel plate. I figured the one for backup air will rarely get used, if ever so I put it under the throttle. It is close to the throttle because if I do have to use it, it will be somewhat of an emergency and I don't want to have to look for it.

The cabin heat is on the outside. The three major cables are 3 inches apart, which fits most hands.
' style=

5 cables

5 cables

' style=

3 inches between major ones

3 inches between major ones

' style=

In the fuselage

In the fuselage

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.