KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  9-13-2016
Number of Hours:  0.25
Manual Reference:  
Brief Description:  Throttle Body 1

The plans lead next to the fuel pump. Mine is already installed on the new engine. So all I did at this point was install to fittings.

Some fittings into the engine received Loctite567. These fittings into the fuel pump also got Locktite. Other rittings for fuel stuff get fuel lube.
' style=

Fuel In

Fuel In

' style=

Fuel Out

Fuel Out

' style=

Fuel Lube

Fuel Lube

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.