KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  9-2-2016
Number of Hours:  0.20
Manual Reference:  
Brief Description:  Engine Preparation 7 - Transducer Fitting

Next you add the fittings to the Van's part that is used for getting Oil Pressure and Fuel Pressure.
Plans say to use high temperature silicon, not tape. So I bought Loctite 567. Found this was popular on Van's Forum and Aircraft Spruce. Also, local A&P advised to use it. So I did. I'll also use Loctite 567 on the fittings that go into the engine.
' style=





' style=

Loctite 567

Loctite 567

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.