KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  5-3-2016
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Fuselage Painting 1

I've been preparing the fuselage for painting. First I had to finish riveting the top skins on. Bob M. and Dan M. pilots from Arlington came over and we finished. I bucked on the inside and they bounded on the outside with the rivet gun.
Then I did some light bondo on rivet heads like I did on other parts so they look better painted.
I also roughed up the all the aluminum with grey Scotch Brite.
Then I washed it all off with painting soap and water.

I made a little dolly for it. Pushed it up into my trailer and drove it to the paint booth.

At the paint booth I took it off the dolly and put it back on the Rotisserie tool.
' style=

On the trailer

On the trailer

' style=

Headed for the paint booth

Headed for the paint booth

' style=

Finally in the paint booth

Finally in the paint booth

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.