KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  2-1-2015
Number of Hours:  0.50
Manual Reference:  
Brief Description:  Main Gear Leg Fairing 4

I drilled a hole at the lower end so a wire can be installed later to hold the hinge pin from coming out. The hinges hold the aft end shut real nice.
' style=

Hole and wire to hold hinge pin

Hole and wire to hold hinge pin

' style=

Aft end held shut nicely

Aft end held shut nicely

' style=

Both lef fairings ready for next step

Both lef fairings ready for next step

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.