Brief Description: Testing controls, modifying around elevator horn
Testing the elevator horn movement with the panels now in place. I noticed that at full trim down and full stick deflection floward, it would hit and bend the boom tube covers. Although that configuration will most likely never be used, I still lengthen the channels so it wouldn't be possible to touch anywhere in the full range of motion.