KitLog pro

Powered By Kitlog Pro v2.0

Project Blue Angels SeaRey
' style=
Date:  1-4-2013
Number of Hours:  4.00
Manual Reference:  5.15 - 5.19
Brief Description:  Section 5: Finished locking down the airframe to t

This step of securing the airframe to the hull was initially taking longer because of waiting for a part, but now was taking longer because of modifications. First, on the back, there was a 1/8" space on both sides from the boom bracket to the transom, so I created L-brackets which filled the space perfectly, and I believe strengthened it also.

I've heard of the fiberglass cracking around the bulkhead crosstubes, so I created brackets around those before locking it down, which also gives it a more finished look. I had previously created these from thin 1/40" aluminum sheeting, but created these new thicker 1/16" ones.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.