|
|
Project Blue Angels SeaRey
|
Date: 1-12-2013
|
Number of Hours: 8.00
|
Manual Reference: 8.5 - 8.14
|
Brief Description: Completed section 8, landing gear
|
|
Even though I'm still waiting on a retaining ring to make the port side boot, I decided to go ahead and install the port landing gear, and I believe I can add the boot around it later. Once I had that side installed, I could hook up the tailwheel retraction and extension.
Luckily, I had seen how another builder, Tom Bowden, connected his tailwheel retraction spring with a ratchet, because I was first scratching my head... way too much tension to get it done by hand. The manual gives no hints on how to connect it, it just says do it.
|
|
Main landing gear finished and down.
|
|
Tailwheel connection to steering, retraction, and extension.
|
|
Must use a rachet to attach the tailwheel retraction spring
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |