Brief Description: Section 32, beginning to secure the nose
With the avionics and wiring done, it's about time to lock down the nose and build the windshield. I drilled the 1/8" holes and installed temporary clecos. I'll replace these with the permanent rivets soon, but waiting as long as I can, because that will make it harder to work on if I do find something not working right. I'll do some more ground tests this weekend to be sure.