KitLog pro

Powered By Kitlog Pro v2.0

Project Blue Angels SeaRey
' style=
Date:  7-24-2013
Number of Hours:  4.00
Manual Reference:  None
Brief Description:  Building front luggage area

Since I have a large locking nose hatch, I wanted to create a luggage area up front to fit a couple of duffle bags and survival gear. With the avionics on a tray above the rudder pedals and the batteries as far forward as possible, there is a perfect area for this, so I fashioned some brackets and fiberglassed them to the hull, which holds a piece of wood across the width of the area. I'm hoping this has the added bonus of strengthening the nose. I found a great suede fabric (to help keep things from sliding around) that I'll attach to some aluminum bars, then attach those bars to the avionics tray and this piece of wood. The fabic will drape in this area, with some elastic on the sides, and I'll have a really useful front baggage compartment.
' style=

Brackets fiberglassed in to hold the front of the baggage compartment in

Brackets fiberglassed in to hold the front of the baggage compartment in

' style=

The suede fabric that will be used in that area

The suede fabric that will be used in that area

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.