KitLog pro

Powered By Kitlog Pro v2.0

Pauls Searey
' style=
Date:  7-15-2008
Number of Hours:  2.00
Manual Reference:  PH
Brief Description:  painting brackets

Painted stringer support, top of lower bulkhead stringer bolt, pulley and cable over-sleeve brackets with 2 pack polyurethane. Also painted upper hull strengthening bars, bilge pump brackets and rear stringer mounting points where fibreglass reinforced.
' style=

painted brackets

painted brackets

' style=

upper hull strengthening bar

upper hull strengthening bar

' style=

bilge pump brackets & rear stringer fibreglass reinforcement

bilge pump brackets & rear stringer fibreglass reinforcement

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.