KitLog pro

Powered By Kitlog Pro v2.0

Scott's Aircraft Build Logs
' style=
Date:  5-5-2019
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Back to work

A bathroom remodel, work on the RV-7 and a few other projects took priority for the last three months. Now it is time to get back to work on the Bearhawk. Things accomplished since last entry.

1. Welded bushings into the flap support structure, no photos. A friend did the welding

2. The previous builder put in the support structure for a wing fence on one wing but not in the second wing. I drilled out 16 rivets and fabricated six flanges. The images show the flanges and their placement in the wing. I do not have the correct size rivets so that task will be accomplished in a day or two.

3. Fabricated and installed the support flange for the flap torque tube support at the root end of the wing.

I will post additional photos tonight.
' style=

Flanges primed

Flanges primed

' style=

Clecoed in place between rib 9 & 10

Clecoed in place between rib 9 & 10

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.