KitLog pro

Powered By Kitlog Pro v2.0

Scott's Aircraft Build Logs
' style=
Date:  2-27-2015
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Dynon prep work

After working on the rudder I moved forward to work on the pitot/AOA lines for the Dynon ADAHRS. Measured for and ordered a Dynon network cable that will run from the net hub (lower part of image two) and the ADAHRS (at the top of image two.) The cable will run along the floor, up along and around the rib to the ADAHRS, With room for the bend radius it comes to 8 1/2', seems long but I measured three times before ordering it.

There is a bracket attached to the left longeron. It need some work to ensure clearance for the static tube from the static ports in the tail. Cut it on the band saw, used the scotch bright wheel to smooth everything and bolted it back in place.

Moving on.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.