This week was also spent working on electrical loads and the panel layout. I have decided to work with UpNorth Aviation to design and cut my panel. These initial photos were taken to show the panel structural modification. I moved the outer support ribs in 5 1/8" to make room for 10" displays. If you look left center on the second image you can see the hole that was predrilled for the original rib. Just right of center you can see the two screw heads where rib is located now.