KitLog pro

Powered By Kitlog Pro v2.0

Scott's Aircraft Build Logs
' style=
Date:  11-2-2014
Number of Hours:  2.00
Manual Reference:  
Brief Description:  More Dynon wiring work - 01

Worked on Dynon wiring this morning. Installed the OAT probe under the left horizontal stabilizer. I also installed a small angle to hold a Adel clamp. The Adel clamp holds the trim wiring away from the elevator push tube and the trim wires and OAT wires are laced together.

Ran the OAT wires through the conduit to just aft of the ADAHRS. I epoxied wire cradles to the aft side of the bulkhead. Once they dry I will lace the OAT wires to the cradles. I thought it got it in the picture but the ADAHRS is located at the top of the screen just out of view.

All wiring from the back of the aircraft up to the ADAHRS unit is installed. The network cable from the ADAHRS to the net hub needs to be installed. As soon as I can cut the cable running from the aft net hub to the forward net hub to size, I will install it. But the aft turtle deck can be riveted on the aircraft. I will to that next weekend.
' style=

OAT probe

OAT probe

' style=

OAT probe on inside

OAT probe on inside

' style=

Last of aft wiring

Last of aft wiring

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.