Date:
10-5-2014
Number of Hours:
4.00
Manual Reference:
Brief Description:
Pitot static work
Worked to finalize the pitot static AOA runs. Drilled three holes in the ADAHRS unit for smap bushings and ran lines up the side of the fuselage. Used a spare seat belt attaching point for stabilizing the lines.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Patrol Home
RV-7 Home
Category
# Logs
# Hours
All
873
3527
Avionics
76
346
Canopy
51
134
Cowling
32
133
Empennage
121
356
Engine
6
24
Finishing
133
532
Firewall Forward
49
227
Flight test
2
6
Fuel lines
7
6
Fuselage
246
730
Links
1
0
Miscellaneous
10
331
Polish
2
21
Pre-building
12
30
Stuff for sale
12
2
Tools
9
39
Wings
1
345
Wings
99
255
Wrap
4
10
Copyright © 2001-2024 Matronics. All Rights Reserved.