Date:  10-5-2014
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Pitot static work

Worked to finalize the pitot static AOA runs. Drilled three holes in the ADAHRS unit for smap bushings and ran lines up the side of the fuselage. Used a spare seat belt attaching point for stabilizing the lines.