KitLog pro

Powered By Kitlog Pro v2.0

Scott's Aircraft Build Logs
' style=
Date:  7-18-2014
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Avionics wiring

The canopy frame and fuselage are ready for fitting the canopy. I have decided to wait until I get some wiring and avionic installation completed. The aircraft is wide open so now is the time to get a few things completed.

1. I have determined wiring runs from the front to back portion of the aircraft.
2. Gone through the Dynon installation manual and started determining locations for all of the various components.
3. Finalized design for AOA/Pitot tube connections from the wing to the fuselage.
4. Ordered various Dynon components

The images show the ADAHRS shelf I built. It is located aft of the baggage compartment. I am gonig to mofe it about 3" further aft up against the rib in the picture. There is a strobe power supply just aft of the baggage compartment and I am concerned about EM interference. The Dynon manual suggests 1 to 2 feet of separation between the ADAHRS and any potential interference source, preferably over 24". Right now I am at 23" so moving it further aft may help eleminate any interference. Plus the current shelf may allow some lateral vibration, moving it aft will allow me to tie into the rib for further stability without adding weight.
' style=

Initial ADAHRS shelf

Initial ADAHRS shelf

' style=

Checking for level

Checking for level

' style=

Trimmed down version

Trimmed down version

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.