KitLog pro

Powered By Kitlog Pro v2.0

Scott's Aircraft Build Logs
' style=
Date:  10-22-2017
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Clean up and wing walk

Today was a day for cleaning the ash out of the hangar, so not much building went on. I did get the wing walk material down on each wing.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.